YVR Airside Operations Building

 

 

Work performed by PWC: Steel framing; exterior sheathing; insulation; ceilings; soffits; drywall; tape and fill.

 

Feature Project:

Beauty and Functionality

 

YVR is in the midst of building its new Airside Operations Building, a state-of-the-art facility that will open in January, 2015.

 

The AOB, as it is commonly referred to, will replace the existing 40-year-old fire hall on YVR’s airfield and consolidate all airside operations into one, central airfield location.

 

From emergency response to snow removal and all airside activities in between, the AOB will support a heightened level of collaboration in order to maintain the highest level of safety for the travelling public and YVR employees.

 

This project incorporates some very attractive and  visually interesting architecture in addition to it's critical functionality as an emergency response centre.

YVR Airside Operations

Location:

Vancouver International Airport

 

General Contractor:

Graham Construction and Engineering Inc.

Web design by Bartman

© 2013 Peninsula Wall and Ceiling Ltd. – All Rights Reserved